Moving quality off WhatsApp and spreadsheets: a switchover plan

How to move a live project's quality records into one system without losing the record or the team's goodwill.

The Traklio team · · 2 min read

Most site quality systems weren't designed. They grew: a spreadsheet for the NCR register, a WhatsApp group for photos, email for approvals, a shared drive for certificates. Each piece works on its own. Together, they mean the record of what happened is spread across a dozen places and several people's phones.

Moving to one system is less about the software than about the switchover. Here is a plan that works on a live project.

1. Pick one project and one package

Don't start with the whole company. Choose one live project, ideally one starting a new package, so the new way of working begins with new work rather than migrating everything at once. A package with a lot of inspections and a few NCRs is ideal.

2. Name a champion on site

Every successful switchover has one person on site who owns it: usually a quality engineer or site manager who is frustrated with the current way of working. Give them the time to set it up and the authority to say "it goes in the system, or it didn't happen".

3. Set it up on your own process

People adopt a system that looks like the work they already do. Load your own ITPs, inspection forms, numbering and approval routes, rather than adapting your process to a template. The first inspection request someone raises should look familiar.

4. Bring the other parties in early

Quality records involve the client, consultant and subcontractors. If they keep working by email, you'll keep two systems. Invite them on day one, with access to only what concerns them, and show them how much less chasing it means for them too.

5. Decide what happens to the old records

You don't need to migrate everything. A sensible rule:

  • Open items (NCRs, inspections, RFIs) move into the new system.
  • Closed items stay where they are, archived and read-only, with a note of where to find them.
  • From an agreed date, nothing new is created the old way.

6. Make the old way harder

Habits are strong. Once the switchover date passes, stop accepting approvals by email and stop running registers in spreadsheets. If someone sends a photo to the group chat, ask them to raise it properly. Within a few weeks, the new way becomes the easy way.

7. Review after the first month

Sit down with the site team after a month. What's slower than before? What's missing? What would they never go back from? Fix the first two, and use the third to bring the next project on board.

Note: The goal isn't a perfect system on day one. It's that, a month in, nobody on the project wants to go back.

How Traklio helps

Traklio is built to replace exactly this mix of tools: inspections, NCRs, RFIs, documents and approvals in one place, with each party seeing only what concerns them. On our pilot programme, we set it up on your own process and run the switchover with your team on a live project.

Join the pilot programme or book a demo.

See it on your own project.

Bring your own ITPs, registers and documents to a demo, or join the pilot and run a live project with our team beside you.